Больше информации по резюме будет доступно после регистрации

Зарегистрироваться
Was online more than two weeks ago

Candidate

Male, 28 years, born on 26 October 1996

Not looking for a job

Кульсары, willing to relocate (Azerbaijan, Georgia, Other regions, Kazakhstan, Russia), prepared for business trips

Maintenance coordinator, planner / planning , consultant, electrical engineer

Specializations:
  • Other
  • Field engineer
  • Electronics engineer
  • Power engineer, electrical engineer
  • Electrician

Employment: full time, part time, project work, work placement

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 7 years 3 months

October 2021November 2024
3 years 2 months

www.bolashak.com

Business Services... Show more

Power operation planning consultant
Leading as the coordinator for the electrical maintenance group within the distribution team, managing and overseeing the execution of all electrical maintenance tasks, ensuring efficient operation and providing strategic direction to ensure optimal performance and safety of the distributionsystems. • Developing strategies and overseeing operational planning for preventive and corrective maintenance activities in the FGP Power operations, ensuring reliability and safety across all systems. • Coordinating the integration of key power generation and distribution systems, managing the transition from system assembly to full operational integration. • Ensuring collaboration with systems completion teams, actively participating in Mechanical Completion (MC) and Ready for Startup (RFSU) walkdowns, and maintaining high-quality standards and adherence to deadlines. • Leading winterization preparation, coordinating technical teams and ensuring readiness for seasonal demands and operations. • Participating in Pre-Startup Safety Review (PSSR) walkdowns, ensuring alignment with technical documentation and safety protocols. • Automating reporting and data presentation processes using JDE, Excel and Power BI, streamlining decision-making and operational efficiency. • Planning and coordinating equipment acceptance, from Mechanical Completion (MC) to Ready for Operations (RFO), utilizing the JDE-E1 system. • Organizing vendor training sessions for electrical engineers, ensuring up-to- date knowledge on new technologies and equipment. • Supporting the Management of Change (MOC) process by conducting functional tests, verifying changes, and updating related documentation. • Assisting in the commissioning of new electrical systems, developing operation manuals, and creating safe switching procedures for new facilities. • Ensuring strict adherence to safety protocols, particularly SI-118 Electrical Safe Work Practices, during the commissioning of new equipment. • Supporting plant operation and maintenance teams by addressing diverse questions and tasks. • Contributing to the development of electrical equipment operation manuals for new projects, along with standard operating instructions and electrical switching protocols for new facilities. • Furnishing technical documentation, drawings, and diagrams to the Engineering and Construction groups pertaining to the current electrical installations and equipment managed by TCO Power System Operations.
April 2019September 2021
2 years 6 months
KENTECH (KKTS)

Кульсары

E&I and Contruction Lead WorkFace Planner Engineer/ Lead Work Pack Engineer
• Identification specific risks associated with execution of planned activities, I/O scheduling. • Coordinating with and providing Workface construction knowledges to project planers, coordinators, managers • Preparing IWP and determining required activities, resources, construction materials,specific condition, quality control, risk planning. • Reviewing AWE,CWE, RWE, CWP, IWP and other project control activties with project supervision to ensure complete understanding of the scope of work and daily&weekly activities. • Ensuring constraint-free IWP's are made available to the field via cross-functional communication& coordination. • Coordinating of a IWP execution with field supervisions and construction engineers & managers • Identifying and creating material matrix lists for the requiring work type activities as per GOST, SNIP and standards requirements of the client. • supervision of the client&company supply materials to ensure correct scope of work requirements materials • Recording and planning man hours, actual equipment hours and actual quantities during execution of work activties. • Modifying, reviewing or adjusting IWP as necessary. • Conversant with process activities, E&I/ F&G/ Telecomm philosophy/specifications and with different type of instruments. Producing sequencing Job activities, test & inspection matrices and compile Work Packs which detail all construction activities such identifications as scope of work, Trade, Tools, Equipments, ManHours, Materials, drawings or scope/contract responsibilities and other activities/issuies which can be meet for the activities e.t.c • Identify any special vendors drawing. (SIEMENS, WASCO, GE and e.t.c) • Reviewing and using such drawings as: P&ID, Mechanical & Electrical isometries, Single line diagrams, Panel termination drawings, Block and Interconnection diagrams, Schematic and Wiring drawings, telecomm drawings, Loop drawings, BOM, manuals and procedures. Also vendors drawings as well (Siemens, Wasco, GE, schneider electric and e.t.c) • Reviewing and preparing such work activities as installation and grounding of the 110KV Gantry, HV-MV-LV distrubution boards, GIS bay's, Transformer (Oil&Harmonic types), Main grid systems and other E//Telecom equipment installation accessories which should be done to full completion e.t.c which relates to the E/\/Telecom philosophy of the Oil&Gas industry. • Reviewing and preparing full instalation works of the Electrical,Instrumentation and telecom systems.
January 2019April 2019
4 months
Sitek Caspian LLP - Turnaround
E&I Work Pack Preparer/ Job pack
•Preparing Risk Assessments and Method Statements •Preparation full detailed description of the work required to be carried out from a given scope of work and specifications. •Allocate into Work Packs all site activities that need to be considered, Destruct, installation, inspection, site testing and commissioning and any specialists vendors works; •Preparation method statements, job cards with hours and covering all jobs personnel employed for the tasks, and final acceptance sheets; •Preparation/work of the P&ID – Piping and Instrumentation Diagram; PFD – Process Flow Diagram; Single Lien Diagram; JB, Panel, Substation Layouts; ISO of the Heat Tracings, Pipings, Hook Up, Loop drawings, Cause effect drawings Making correction by the last revision. •Constructability Reviews and similar sessions as required. •Provided assistance to Construction team members as required during survey and execution phases of the work. •Monitoring and daily analysis about work progress •Participating in the calibration, loop check, Electrical (Mineral, Self-regulating) Heat Tracing installation •Interfaced with planning team to ensure all tasks within workpack. •Co-operated with various departments like Engineering (who provides working drawings), Procurement (who buys materials), Contracts (who awards contracts & raise any issues with the client), quality (who maintains) & Commissioning Departments quired. •Participating in project meetings and discussions with the Client as required
January 2018January 2019
1 year 1 month
CCC (Consolidated Contractors Company)

Atyrau

Construction, Real Estate, Architecture... Show more

QA/QC RA assistant
•Monitoring and daily analysis of the performance of construction contractors daily and monthly schedules of building of objects •Preparation and timely provision of information to the group operational accountability for the formation of reports of completed and ongoing works •Providing daily information on the progress of the construction works at the construction site •Works together with Technical Supervision Engineer on dealing with Subcontractor companies •Control of all logs by projects (3GP), control of subcontractor companies documents •Provide and update tables/forms/database of personnel documents •Update of database for QA/QC personnel, Surveyors •Making out the official letters for governmental authorities; •Preparation of Monthly Report of works done during the week •Gathering, analysis and completing RA documents, to be provided to Working and State Acceptance Commissions •Quality control of the carried-out works, works according to the project (3GP) and working packages, logging of a work logs by the specific of the department, check sheets, NFI by SNIP, VSN, GOST
March 2017April 2017
2 months
Logic Services Kazakhstan

Atyrau, logicsk.com/about_company/

Power Industry... Show more

Практикант
Участвовал и организовывал пуско-наладочные работы в сфере автоматизации и управлении, а так жу участвовал при колибровочных работах в КазСтройСервис
January 2017February 2017
2 months
NCOC

Atyrau

Oil and Gas... Show more

Стажер
Практика в департаменте технической поддержки производства, отдел внутреннего контроля. Участвовал в аудите по экспорту гранулированной серы, а так же участвовал в аудите по закачке сырого газа по месторождению Кашаган.

Skills

Skill proficiency levels
MS Excel
Primavera
Oracle Primavera
Adobe Acrobat
Smart Plant
EDMS
Roser
AutoCAD
Naviswork
Access control
coreworx data base system
smart plant overview
JDEdwards
E1
Cms

Driving experience

Own car

Driver's license category B

Higher education (bachelor)

2019
Нефтегазовое дело, эксплуатация и обслуживание объектов транспорта, добычи и хранения нефти, газа, газа-конденсата и подземных хранилищ
2017
Apec Petrotechnic
Электроснабжение, техник - электрик
2017
The Southern Alberta Institute of Technology (SAIT) Polytechnic
1) Instrumentation; 2) PFO (Petroleum Field Operator), Automation Control

Languages

KazakhNative


EnglishC2 — Proficiency


RussianC2 — Proficiency


TurkishA2 — Elementary


Professional development, courses

2020
Onshore H2S induction course
Seftec

Tests, examinations

2020
HSE induction courses
TengizChevrOil
2017
Foundation Course in English from SAIT Polytechnic
SAIT Polytechnic
2017
Basic live support
YKK
2017
H2S OPITO
YKK
2017
HSE induction
NCOC
2015
PIO-Petroleum Introduction Overview
SAIT Polytechnic
2015
Basic Specialty of Petroleum Engineering Technology
SAIT Polytechnic

Citizenship, travel time to work

Citizenship: Kazakhstan

Desired travel time to work: Doesn't matter